|
What a sweet couple these two are.
They gave us a key to their house last fall before they left for Myrtle
Beach. "Have it done by April 1st," was their only request.
The job included removing the wall between the kitchen and dining room and
putting up a LVL beam. A new
100 amp breaker panel upgrade was installed. New drywall, paint and
porcelain floor tile finish the room, before the HomeCrest Cabinets and
Corian countertops were installed.
Thanks folks!
Enjoy!
|